|
Port Augusta track extension project |
|
|
Page 8 of 9 Part 8 - October 2001Ballasting and tamping work has continued, and the following photos were captured in early October 2001.  PRR volunteer Josh George catches up on some sleep in NT76 during a pause in ballasting at Port Augusta  View from the drivers' seat of NT76 at Harris St crossing. The machine in the mirror is on the standard gauge line which parallels the PRR narrow gauge.  A pair of NR's on a steel train race past the PRR tamper. The NR's were travelling at about 50km/h, while the tamper works at about 2km/day
|